about the job
i. Establish a reliable historical cost baseline
• Analyse FY2026 year-to-date general ledger transactions by legal entity, country, campus/site, cost centre, G/L account, cost category and month; supplement with FY2025 data where available.
...
• Reconcile operational cost reports to Finance-approved GL balances; identify and explain material accruals, reversals, prepayments, duplicate postings, FX effects and intercompany / allocation issues.
• Reconcile contracted services to purchase orders, vendor agreements, invoices, actual utilisation and known commitments. Flag incomplete and unsupported source data.
ii. Review COGS classification and cost allocation
• Create a G/L-to-cost-category mapping, distinguishing direct operating costs, recoverable / pass-through customer costs.
• Assess utilities, site rental, preventive/reactive maintenance, security, cleaning, FM services, insurance, professional fees, staffing-related costs and miscellaneous overheads. Specifically flag policy questions such as site insurance versus corporate insurance, training, travel, recruitment and head-office costs.
• Document rationale and exceptions for Corporate Finance validation; do not make accounting-policy determinations or book reclassification journals without Finance approval.
Page
iii. Reconcile FY2026 forecast and FY2027 budget methodologies
• Build an apples-to-apples reconciliation of the FY2026 actual / forecast baseline, the DC Operations FY2027 submissions and the Corporate Finance / BO comparison version, using the same period, site scope, cost definition and currency basis.
• Test vendor escalation assumptions against contract expiry, escalation clauses, supplier quotations and historical rate changes. Do not apply a blanket 10% uplift without supporting evidence or a clearly labelled scenario.
• Challenge reactive maintenance assumptions (e.g., 5% vs 10–15% provisions), checking warranty / defects-liability-period responsibility, incident history, asset age, preventive maintenance and planned works.
• Identify new or missing budget items, including 24×7 clinic support, additional security / cleaning headcount, service ramp-up, mobilisation and costs commencing in FY2027 or FY2028. Prevent double counting of overlapping assumptions.
iv. Analyse operating cost drivers and opportunities
• Assess the largest cost pools by site and driver: electricity and water consumption / tariffs / recoverability, active IT load and ramp-up, cleaning footprint.
• Calculate comparable metrics such as USD per live IT MW-month, maintenance spend per site / asset group, utilities per kWh and outsourced services per operating site. • Explain cost changes through a price–volume–scope–timing–FX bridge, distinguishing genuine operational growth from methodology differences or accounting reclassification.
v. Produce decision-ready reporting and handover
• Build a controlled Excel analytical model (Power Query or Power BI optional), with a data dictionary, source links, clearly identified assumptions, version control and refresh instructions.
• Present material gaps, financial exposure / opportunity, recommended actions and owners to the DCO leadership and Corporate Finance; facilitate working sessions to resolve exceptions.
• Transfer the model, source references, open-item log and methodology guide to the incoming DCO Finance Manager at the end of the assignment.
Requirements:
• 6–10+ years of hands-on FP&A, cost accounting, management accounting, controllership or cost transformation experience; strong experience in contract-led operating environments.
• Able to personally interrogate large GL datasets, reconcile SAP/ERP transactions and construct robust Excel analysis; advanced pivot tables, Power Query and clear management visualisation essential.
• Strong knowledge of direct / indirect cost treatment, accruals, budgeting, vendor cost models, foreign currency and variance analysis. IFRS / MFRS reporting awareness is valuable.
• Experience in data centres, facilities management, infrastructure, engineering operations, utilities or outsourcing is preferred; finance qualification (ACCA / CPA / CIMA or equivalent) advantageous.
• Confident independently challenging assumptions, speaking with operational cost owners and presenting concise findings in English. Immediate / near-term availability