about the company
Our client is a leading global engineering firm and is seeking skilled Intermediate to Senior Mechanical Design Engineers with strong data center experience to join their growing team.
...
about the job
Design mechanical systems for data centers including HVAC, chilled water, ventilation, and fire protection.
Perform load calculations, equipment selection, and system layouts.
Prepare technical drawings, specifications, and design documentation.
Coordinate with electrical and civil teams to ensure seamless system integration.
Ensure compliance with international standards (e.g., ASHRAE, Uptime Institute) and local codes.
skills/requirements
Bachelor's Degree in Mechanical Engineering or any related field.
Minimum 3 years’ experience in M&E consultancy, with exposure to data centers or critical infrastructure.
Proficiency in AutoCAD, Revit, and HVAC design software.
Strong understanding of mechanical systems and performance requirements.
Effective communicator with good coordination skills.
The above is just a guideline about the position. Candidates with the necessary qualifications are welcome to apply.
Please apply through this advertisement for a smooth application to register your interest.
*Due to the high volume of applicants, only shortlisted candidates will be contacted.